Location: Serres
Project budget: 1.603.575,00 €
The project concerns the creation of a Green Point in accordance with the definition of the categories and specifications of Green Points.
The Green Point will essentially consist of a fenced outdoor area with metal containers for the storage of materials, a covered area of about 632m2 where small materials will be collected, sorted and temporarily stored, as well as the compression of the paper – cardboard stream. Also included is an outdoor area of around 375m2 for the collection and management of green waste, including a 60m2 shelter for shredding equipment.