Construction of a green waste management point for the Municipality of Serres

Location: Serres

Project budget: 1.603.575,00 €

The project concerns the creation of a Green Point in accordance with the definition of the categories and specifications of Green Points.

The Green Point will essentially consist of a fenced outdoor area with metal containers for the storage of materials, a covered area of about 632m2 where small materials will be collected, sorted and temporarily stored, as well as the compression of the paper – cardboard stream. Also included is an outdoor area of around 375m2 for the collection and management of green waste, including a 60m2 shelter for shredding equipment.

Related work

Construction of a five-storey luxury building with parking spaces and underground storage rooms

Location: 3 Agia Sofia, Kalamaria Thessaloniki The building to be constructed consists of a basement, ground floor, 4 floors with apartments, and a planted roof. The building has a central staircase and an elevator serving all passable levels of the building. In the surrounding area of the building, the creation of outdoor parking spaces for […]

Learn More

Improvement of the infrastructure of the land area of ​​the port of the fishing refuge of Ν. Kallikrateia Halkidiki

Location: Νea Kallikrateia, Halkidiki Project budget: 2.362.903,23 €  The project concerns the stabilization of the coastal slope of the settlement of Nea Kallikrateia and the construction of the necessary road works to improve traffic conditions in order to achieve the safe movement of vehicles and pedestrians.

Learn More

Restoration of pedestals of the bridge of the river Nestos on the National Road No.14 Drama Paranesti

Location: Drama Project budget: 1.290.000,00 € The bridge is located on the highway 14 Drama – Xanthi and bridges the river Nestos with a total span of 203. 89 m in the area of Paranesti and was severely damaged.

Learn More