Oscar Olympic Hotel
AS build S.A. undertook the execution of the project, interior works, renovation, adaptation of facades in an existing hotel building with basement, ground floor, mezzanine and 7 floors. The aim of the interventions is the functional, energy and aesthetic upgrading, the increase of the capacity and providing new and higher level services to customers.

Construction of a mushroom production plant
The project includes the construction of two buildings. One building will consist of two volumes, on the south side a canopy will be built to house mechanical equipment and the second building will consist of 2 floors. In addition, two gas tanks will be placed, a weighbridge will be constructed and a mesh fence will […]

Training centre DESFA
The project concerns the construction of a two-storey building that will function as a training center of the “National Natural Gas System Operator SA.” (DESFA SA). In addition to the construction of the Education Building, the construction of a metal shed is also planned. The load-bearing structure of the building will consist of Reinforced Concrete, […]

Construction of a green waste management point for the Municipality of Serres
Project budget: 1.603.575,00 € The project concerns the creation of a Green Point in accordance with the definition of the categories and specifications of Green Points. The Green Point will essentially consist of a fenced outdoor area with metal containers for the storage of materials, a covered area of about 632m2 where small materials will […]

Upgrading and restoration of the Metropolitan Palace of the Holy Metropolis of Maroneia and Komotini
Project budget: 1.850.000,00 € The project concerns the continuation and completion of the restoration and upgrading of the Metropolitan Palace of the Holy Metropolis of Maroneia and Komotini, which is built within the Byzantine castle of Komotini. The works that will be carried out are the remodelling of the facades and the exterior, the strengthening and […]

Sanitary upgrading of the interiors of the buildings of the General Hospital of Drama
Project budget: 2.000.000,00 € The project will contribute substantially to the sanitary upgrading of the interiors of the buildings of the General Hospital of Drama and consequently to the optimization of the quality and maximization of the quantity of health services. The replacement of the old worn floors of all areas of the hospital with new modern […]

Construction of water supply tanks for the settlement of the Municipality of Paggaio
Project budget: 1.070.000,00 € The project concerns the construction of three two-chamber tanks, one underground and two above ground. Each tank will have the necessary vestibule (valve station) to protect and control access to the electromechanical equipment, valves and chambers.

Restoration of pedestals of the bridge of the river Nestos on the National Road No.14 Drama Paranesti
Project budget: 1.290.000,00 € The bridge is located on the highway 14 Drama – Xanthi and bridges the river Nestos with a total span of 203. 89 m in the area of Paranesti and was severely damaged.

Improvement of the infrastructure of the land area of the port of the fishing refuge of Ν. Kallikrateia Halkidiki
Project budget: 2.362.903,23 € The project concerns the stabilization of the coastal slope of the settlement of Nea Kallikrateia and the construction of the necessary road works to improve traffic conditions in order to achieve the safe movement of vehicles and pedestrians.

Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors
AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.