Restoration of pedestals of the bridge of the river Nestos on the National Road No.14 Drama Paranesti
Location: Drama Project budget: 1.290.000,00 € The bridge is located on the highway 14 Drama – Xanthi and bridges the river Nestos with a total span of 203. 89 m in the area of Paranesti and was severely damaged.
Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors
AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.
Improvement – repair of existing pavements on the Thessaloniki – Katerini highway, in the section Chalkidona – Katerini
AS build S.A. in joint venture with the company DION S.A. has undertaken the repair, maintenance and restoration of the damage to the road of P.E.O. Thessaloniki – Katerini, in the Chalkidona – Katerini section.
Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams
Location: Polygyros, Halkidiki Project budget: 2.000.000,00 € The project concerns the increase of throughput and the restoration of existing techniques.
