Construction of a green waste management point for the Municipality of Serres

Project budget: 1.603.575,00 €

The project concerns the creation of a Green Point in accordance with the definition of the categories and specifications of Green Points.

The Green Point will essentially consist of a fenced outdoor area with metal containers for the storage of materials, a covered area of about 632m2 where small materials will be collected, sorted and temporarily stored, as well as the compression of the paper – cardboard stream. Also included is an outdoor area of around 375m2 for the collection and management of green waste, including a 60m2 shelter for shredding equipment.

Related work

Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams

Project budget: 2.000.000,00 € The project concerns the increase of throughput and the restoration of existing techniques.

Learn More

Enhancement – repair of existing roads P.E.O. Thessaloniki – Katerini, in the Chalkidona – Katerini section

AS build S.A. in joint venture with the company DION S.A. has undertaken the repair, maintenance and restoration of the damage to the road of P.E.O. Thessaloniki – Katerini, in the Chalkidona – Katerini section.

Learn More