Public Projects

Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors

AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.

Learn More

Improvement – repair of existing pavements on the Thessaloniki – Katerini highway, in the section Chalkidona – Katerini

AS build S.A. in joint venture with the company DION S.A. has undertaken the repair, maintenance and restoration of the damage to the road of P.E.O. Thessaloniki – Katerini, in the Chalkidona – Katerini section.

Learn More

Landscaping works for the installation of 35 prefabricated classrooms and supply

The project concerns the configuration of the plots owned by the Municipality of Thessaloniki for the installation of prefabricated rooms, which will be used as classrooms. The supply and installation of 35 rooms with appendix w.c., which will include tables and infant chairs, desk and seat for kindergarten teachers and infant cabinets. In addition, the […]

Learn More

Extension of Primary School in N. Souli

Project budget: 1.403.225,81 € The project concerns the construction of an additional building unit, which will coexist with the existing Primary School on the same plot, in the context of reinforcement the operation of the All-Day Primary School. The building includes a ground floor, basement and first floor, while it has a final height from […]

Learn More

Arrangement of torrent Chrenteli I.M. Saint Gregory

Project budget: 614.164.76 € The project concerns the arrangement of the torrent Chrenteli of the Holy Monastery of Saint Gregory, and includes the following constructions: Construction of an open trapezoidal sewer about 85m long. Construction of a bridge at the height of the platform with deck width 6,0m. Construction of a footbridge with width 1,3m […]

Learn More

Reconstruction of the center of N. Moudania

Project budget: 4.400.000 € The project concerns the reconstruction of the center of N. Moudania, with the aim of creating an organized and upgraded urban environment while creating high quality infrastructure. The construction of the project started on 22/06/2018 and is in progress until today.

Learn More

Construction of a model Municipal Nursing Home of Polygyros – Completion

Project budget: 3.143.080 € The project concerns the completion of the existing Nursing Home in Polygyros, which has been constructed outside the Plan, in the north-western area of the settlement of Polygyros, with an area of 7,067.90 sq.m .. The object of the contract is all the necessary works in order for the completion and […]

Learn More

Thira Caldera Slope Mounting – Fira-Cable Car Port Area

Budget: 1.699.400,00 € The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of tourists […]

Learn More

Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 € The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style […]

Learn More

Cultural Center of Ampelokipoi Thessaloniki

Budget: 4.910.462,00 €  This six-storey construction of two-storey building with basement parking using diaphragm walls, bored piles and metal supports. will house the public library, gym, theater stage, offices and utility rooms.

Learn More

Construction of Compression System of Waste and development of the Surrounding area of the Waste Transfer Station in Pylaia, Thessaloniki

Budget : 3.100.000,00 € The project involves extending the waste compression system, the construction of a new compression unit and accessories dedusting filters – deodorization in order to achieve the restriction of the heavy volume of air from the discharge of waste into the hopper of pressurization, lining the interior of the new and existing […]

Learn More

Construction Of New Primary School Building In N.Santa Kilkis

Budget: 3.127.530,00 €  This project is about the construction of the new elementary school in the village N. Santa of Kilkis. It includes the construction of a two-storey building with basement, total surface 1.800,00 m2, basketball, volleyball and handball courts.

Learn More

Construction of Primary School in Portaria, Nea Propontida, Halkidiki

The project includes the completion of the primary school in Portaria Nea Propontida, Halkidiki. It includes the construction of masonry, plastering works, electromechanical works and landscaping.

Learn More

Elementary School Construction Sifnou

Budget: 3.700.400,00 € Basic design of the project is the construction of a new school of elementary school of Sifnos at “Fyrogia” region. It consists of four buildings with a total area of ​​2,370.00 sq.m. and includes 12 classrooms, laboratories, administrative and other offices and shared functions.

Learn More

Retaining Slope Kalntera Thiras -Area Port Athinios (Santorini Island)

Budget : 1.699.400,00 €  The aim of this project is to address rock falls and minimize the risk of accidents in the existing access road to the main port of Santorini island and the total slope of the amphitheater port Athinios. Τhis construction refers to a road that haw a total length of 3.352 m, […]

Learn More
ergo-thira

Retaining Slope Kalntera Thiras – Old Port Aera Fira -Cable Car(Santorini Island)

Budget : 1.699.400,00 €  The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of […]

Learn More

Restoration of the Area Park -Garden in the City of Kilkis

Budget: 4.950.750,00 €  This construction includes undercut buildings and walkways, special constructions, installation of water supply, sewerage, water elements and surfaces, construction machinery water treatment, pumping, etc.

Learn More

Project of bioclimate upgrade of the Xrimatistirio Square in Thessaloniki

Budget: 5.405.000,00 €  The project is about the bioclimatic upgrade of the Xrimatistirio Square and a significant portion of the old commercial and business center of Thessaloniki. The particular area is bounded by Egnatia, Ion Dragoumi Tsimiski and Dodecanese streets. The project includes coatings work with cold and photocatalytic materials, asphalt, construction of fountains and […]

Learn More

Renovation and reuse of a modern Greek tobacco warehouse in the city of Kilkis

It concerns restoration work of morphological, functional characteristics and static reinforcement of the resistance of the existing listed building (Ministry of CFI. Ministry of Culture/C/3108/62323 4th Ephorate of historical monuments)

Learn More