Energy renovation, modernisation, and improvement of Health Centres of the 4th Y.PE.
Location: Macedonia and Thrace The scope of the project is the upgrading of the building infrastructure and facilities of the Health Centers, which will contribute to the quality improvement of healthcare services. Health Center of Sapes, Health Center of Iasmos, Health Center of Avdira, Health Center of Echinos, Health Center of Stavroupoli, Health Center of […]
Renovation of various departments and upgrading of electromechanical installations of the General Hospital ”Agios Pavlos”
Location: Kalamaria, Thessaloniki The project includes the execution of various works, namely the renovation of the orthopedic, pathology and surgery department, the renovation of the 4th floor, the doctors’ dormitories and various common areas, the renovation of the emergency departments, the conversion of the kitchens into office space, the replacement of a generator and three […]
Construction of a green waste management point for the Municipality of Serres
Location: Serres Project budget: 1.603.575,00 € The project concerns the creation of a Green Point in accordance with the definition of the categories and specifications of Green Points. The Green Point will essentially consist of a fenced outdoor area with metal containers for the storage of materials, a covered area of about 632m2 where small […]
Upgrading and restoration of the Metropolitan Palace of the Holy Metropolis of Maroneia and Komotini
Location: Komotini Project budget: 1.850.000,00 € The project concerns the continuation and completion of the restoration and upgrading of the Metropolitan Palace of the Holy Metropolis of Maroneia and Komotini, which is built within the Byzantine castle of Komotini. The works that will be carried out are the remodelling of the facades and the exterior, the […]
Sanitary upgrading of the interiors of the buildings of the General Hospital of Drama
Location: Drama Project budget: 2.000.000,00 € The project will contribute substantially to the sanitary upgrading of the interiors of the buildings of the General Hospital of Drama and consequently to the optimization of the quality and maximization of the quantity of health services. The replacement of the old worn floors of all areas of the hospital with […]
Construction of water supply tanks for the settlement of the Municipality of Paggaio
Location: Eleftheroupoli, Kavala Project budget: 1.070.000,00 € The project concerns the construction of three two-chamber tanks, one underground and two above ground. Each tank will have the necessary vestibule (valve station) to protect and control access to the electromechanical equipment, valves and chambers.
Restoration of pedestals of the bridge of the river Nestos on the National Road No.14 Drama Paranesti
Location: Drama Project budget: 1.290.000,00 € The bridge is located on the highway 14 Drama – Xanthi and bridges the river Nestos with a total span of 203. 89 m in the area of Paranesti and was severely damaged.
Improvement of the infrastructure of the land area of the port of the fishing refuge of Ν. Kallikrateia Halkidiki
Location: Νea Kallikrateia, Halkidiki Project budget: 2.362.903,23 € The project concerns the stabilization of the coastal slope of the settlement of Nea Kallikrateia and the construction of the necessary road works to improve traffic conditions in order to achieve the safe movement of vehicles and pedestrians.
Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors
AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.
Improvement – repair of existing pavements on the Thessaloniki – Katerini highway, in the section Chalkidona – Katerini
AS build S.A. in joint venture with the company DION S.A. has undertaken the repair, maintenance and restoration of the damage to the road of P.E.O. Thessaloniki – Katerini, in the Chalkidona – Katerini section.
Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams
Location: Polygyros, Halkidiki Project budget: 2.000.000,00 € The project concerns the increase of throughput and the restoration of existing techniques.
Landscaping works for the installation of 35 prefabricated classrooms and supply
The project concerns the configuration of the plots owned by the Municipality of Thessaloniki for the installation of prefabricated rooms, which will be used as classrooms. The supply and installation of 35 rooms with appendix w.c., which will include tables and infant chairs, desk and seat for kindergarten teachers and infant cabinets. In addition, the […]
Extension of Primary School in N. Souli
Project budget: 1.403.225,81 € The project concerns the construction of an additional building unit, which will coexist with the existing Primary School on the same plot, in the context of reinforcement the operation of the All-Day Primary School. The building includes a ground floor, basement and first floor, while it has a final height from […]
Arrangement of torrent Chrenteli I.M. Saint Gregory
Project budget: 614.164.76 € The project concerns the arrangement of the torrent Chrenteli of the Holy Monastery of Saint Gregory, and includes the following constructions: Construction of an open trapezoidal sewer about 85m long. Construction of a bridge at the height of the platform with deck width 6,0m. Construction of a footbridge with width 1,3m […]
Reconstruction of the center of N. Moudania
Project budget: 4.400.000 € The project concerns the reconstruction of the center of N. Moudania, with the aim of creating an organized and upgraded urban environment while creating high quality infrastructure. The construction of the project started on 22/06/2018 and is in progress until today.
Construction of a model Municipal Nursing Home of Polygyros – Completion
Project budget: 3.143.080 € The project concerns the completion of the existing Nursing Home in Polygyros, which has been constructed outside the Plan, in the north-western area of the settlement of Polygyros, with an area of 7,067.90 sq.m .. The object of the contract is all the necessary works in order for the completion and […]
Thira Caldera Slope Mounting – Fira-Cable Car Port Area
Budget: 1.699.400,00 € The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of tourists […]
Kaftanzoglio Stadium: Repair and maintenance of facilities
Budget : 917.500,00 € The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style […]
Cultural Center of Ampelokipoi Thessaloniki
Budget: 4.910.462,00 € This six-storey construction of two-storey building with basement parking using diaphragm walls, bored piles and metal supports. will house the public library, gym, theater stage, offices and utility rooms.
Construction of Compression System of Waste and development of the Surrounding area of the Waste Transfer Station in Pylaia, Thessaloniki
Budget : 3.100.000,00 € The project involves extending the waste compression system, the construction of a new compression unit and accessories dedusting filters – deodorization in order to achieve the restriction of the heavy volume of air from the discharge of waste into the hopper of pressurization, lining the interior of the new and existing […]
Construction Of New Primary School Building In N.Santa Kilkis
Budget: 3.127.530,00 € This project is about the construction of the new elementary school in the village N. Santa of Kilkis. It includes the construction of a two-storey building with basement, total surface 1.800,00 m2, basketball, volleyball and handball courts.
Construction of Primary School in Portaria, Nea Propontida, Halkidiki
The project includes the completion of the primary school in Portaria Nea Propontida, Halkidiki. It includes the construction of masonry, plastering works, electromechanical works and landscaping.
Elementary School Construction Sifnou
Budget: 3.700.400,00 € Basic design of the project is the construction of a new school of elementary school of Sifnos at “Fyrogia” region. It consists of four buildings with a total area of 2,370.00 sq.m. and includes 12 classrooms, laboratories, administrative and other offices and shared functions.
Retaining Slope Kalntera Thiras -Area Port Athinios (Santorini Island)
Budget : 1.699.400,00 € The aim of this project is to address rock falls and minimize the risk of accidents in the existing access road to the main port of Santorini island and the total slope of the amphitheater port Athinios. Τhis construction refers to a road that haw a total length of 3.352 m, […]
Retaining Slope Kalntera Thiras – Old Port Aera Fira -Cable Car(Santorini Island)
Budget : 1.699.400,00 € The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of […]
Restoration of the Area Park -Garden in the City of Kilkis
Budget: 4.950.750,00 € This construction includes undercut buildings and walkways, special constructions, installation of water supply, sewerage, water elements and surfaces, construction machinery water treatment, pumping, etc.
Project of bioclimate upgrade of the Xrimatistirio Square in Thessaloniki
Budget: 5.405.000,00 € The project is about the bioclimatic upgrade of the Xrimatistirio Square and a significant portion of the old commercial and business center of Thessaloniki. The particular area is bounded by Egnatia, Ion Dragoumi Tsimiski and Dodecanese streets. The project includes coatings work with cold and photocatalytic materials, asphalt, construction of fountains and […]
Renovation and reuse of a modern Greek tobacco warehouse in the city of Kilkis
It concerns restoration work of morphological, functional characteristics and static reinforcement of the resistance of the existing listed building (Ministry of CFI. Ministry of Culture/C/3108/62323 4th Ephorate of historical monuments)
