Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 €

The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style with materials and workshops certified by the IAAF Class 1 and the final result was certified by an international laboratory by obtaining the corresponding certification provided in the IAAF class 1 stadiums for the floor and its grading.

The supervision of the project was carried out by the General Secretariat for Sport.

Related work

Renovation and reuse of a modern Greek tobacco warehouse in the city of Kilkis

It concerns restoration work of morphological, functional characteristics and static reinforcement of the resistance of the existing listed building (Ministry of CFI. Ministry of Culture/C/3108/62323 4th Ephorate of historical monuments)

Learn More