Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 €

The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style with materials and workshops certified by the IAAF Class 1 and the final result was certified by an international laboratory by obtaining the corresponding certification provided in the IAAF class 1 stadiums for the floor and its grading.

The supervision of the project was carried out by the General Secretariat for Sport.

Related work

Construction of Compression System of Waste and development of the Surrounding area of the Waste Transfer Station in Pylaia, Thessaloniki

Budget : 3.100.000,00 € The project involves extending the waste compression system, the construction of a new compression unit and accessories dedusting filters – deodorization in order to achieve the restriction of the heavy volume of air from the discharge of waste into the hopper of pressurization, lining the interior of the new and existing […]

Learn More