Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 €

The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style with materials and workshops certified by the IAAF Class 1 and the final result was certified by an international laboratory by obtaining the corresponding certification provided in the IAAF class 1 stadiums for the floor and its grading.

The supervision of the project was carried out by the General Secretariat for Sport.

Related work

Reconstruction of the center of N. Moudania

Project budget: 4.400.000 € The project concerns the reconstruction of the center of N. Moudania, with the aim of creating an organized and upgraded urban environment while creating high quality infrastructure. The construction of the project started on 22/06/2018 and is in progress until today.

Learn More
ergo-thira

Retaining Slope Kalntera Thiras – Old Port Aera Fira -Cable Car(Santorini Island)

Budget : 1.699.400,00 €  The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of […]

Learn More