Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 €

The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style with materials and workshops certified by the IAAF Class 1 and the final result was certified by an international laboratory by obtaining the corresponding certification provided in the IAAF class 1 stadiums for the floor and its grading.

The supervision of the project was carried out by the General Secretariat for Sport.

Related work

Restoration of pedestals of the bridge of the river Nestos on the National Road No.14 Drama Paranesti

Location: Drama Project budget: 1.290.000,00 € The bridge is located on the highway 14 Drama – Xanthi and bridges the river Nestos with a total span of 203. 89 m in the area of Paranesti and was severely damaged.

Learn More

Arrangement of torrent Chrenteli I.M. Saint Gregory

Project budget: 614.164.76 € The project concerns the arrangement of the torrent Chrenteli of the Holy Monastery of Saint Gregory, and includes the following constructions: Construction of an open trapezoidal sewer about 85m long. Construction of a bridge at the height of the platform with deck width 6,0m. Construction of a footbridge with width 1,3m […]

Learn More