Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 €

The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style with materials and workshops certified by the IAAF Class 1 and the final result was certified by an international laboratory by obtaining the corresponding certification provided in the IAAF class 1 stadiums for the floor and its grading.

The supervision of the project was carried out by the General Secretariat for Sport.

Related work

Restoration of the Area Park -Garden in the City of Kilkis

Budget: 4.950.750,00 €  This construction includes undercut buildings and walkways, special constructions, installation of water supply, sewerage, water elements and surfaces, construction machinery water treatment, pumping, etc.

Learn More

Construction of a model Municipal Nursing Home of Polygyros – Completion

Project budget: 3.143.080 € The project concerns the completion of the existing Nursing Home in Polygyros, which has been constructed outside the Plan, in the north-western area of the settlement of Polygyros, with an area of 7,067.90 sq.m .. The object of the contract is all the necessary works in order for the completion and […]

Learn More