Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 €

The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style with materials and workshops certified by the IAAF Class 1 and the final result was certified by an international laboratory by obtaining the corresponding certification provided in the IAAF class 1 stadiums for the floor and its grading.

The supervision of the project was carried out by the General Secretariat for Sport.

Related work

Thira Caldera Slope Mounting – Fira-Cable Car Port Area

Budget: 1.699.400,00 € The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of tourists […]

Learn More

Arrangement of torrent Chrenteli I.M. Saint Gregory

Project budget: 614.164.76 € The project concerns the arrangement of the torrent Chrenteli of the Holy Monastery of Saint Gregory, and includes the following constructions: Construction of an open trapezoidal sewer about 85m long. Construction of a bridge at the height of the platform with deck width 6,0m. Construction of a footbridge with width 1,3m […]

Learn More