Repairment and Conservation of Building in Port Of Thessaloniki

Related work

Restoration of pedestals of the bridge of the river Nestos on the National Road No.14 Drama Paranesti

Location: Drama Project budget: 1.290.000,00 € The bridge is located on the highway 14 Drama – Xanthi and bridges the river Nestos with a total span of 203. 89 m in the area of Paranesti and was severely damaged.

Learn More

Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors

AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.

Learn More

Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams

Location: Polygyros, Halkidiki Project budget: 2.000.000,00 € The project concerns the increase of throughput and the restoration of existing techniques.

Learn More