Restoration of the Nestos river bridge on National Road No. 14 Drama – Paranesti – Border of Drama / Xanthi

AS build S.A. is the contractor of the project.

Related articles

Upgrading and restoration of the Metropolitan Palace of the Holy Metropolis of Maroneia and Komotini

AS build S.A. is the contractor of the project. The Metropolitan Palace was made, according to the available data, between the years 1959-62. The building is free on all sides in the southern part of the plot. It mainly consists of a compact, rectangular outline of a surface area of ​​approximately 370 m2 with a […]

Learn More