On October 26th AS build S.A. signed a contract with the Municipality of Nea Propontida for the construction – improvement of the infrastructure of the land area of the fishing refuge of Nea Kallikrateia.
Related articles
Upgrading and restoration of the Metropolitan Palace of the Holy Metropolis of Maroneia and Komotini
AS build S.A. is the contractor of the project. The Metropolitan Palace was made, according to the available data, between the years 1959-62. The building is free on all sides in the southern part of the plot. It mainly consists of a compact, rectangular outline of a surface area of approximately 370 m2 with a […]
Construction of water supply tanks of settlements in the Municipality of Paggaio
AS build S.A. is the contractor of the project. The object of the project is the construction of three new two-chamber tanks from reinforced concrete with a total useful volume of approximately 1100m3 each, with the necessary antechamber to protect and control access to the electromechanical equipment, the valves and the tank chambers.
Prime Minister Kyriakos Mitsotakis visited the Primary School of N. Souli
The prime minister, as part of his tour in Serres, visited the Primary School of N. Souli, where he was guided around the premises of the new building.
