Project budget: 614.164.76 €
The project concerns the arrangement of the torrent Chrenteli of the Holy Monastery of Saint Gregory, and includes the following constructions:
- Construction of an open trapezoidal sewer about 85m long.
- Construction of a bridge at the height of the platform with deck width 6,0m.
- Construction of a footbridge with width 1,3m
- Construction of an underground pipeline across the sewer for the passage of networks with wells.
- Rehabilitation measures the trunk of the existing bridge of the path.
The construction of the project started on 15/10/2018 and is in progress until today.