Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams

Location: Polygyros, Halkidiki

Project budget: 2.000.000,00 €

The project concerns the increase of throughput and the restoration of existing techniques.

Related work

Sanitary upgrading of the interiors of the buildings of the General Hospital of Drama

Location: Drama Project budget: 2.000.000,00 € The project will contribute substantially to the sanitary upgrading of the interiors of the buildings of the General Hospital of Drama and consequently to the optimization of the quality and maximization of the quantity of health services. The replacement of the old worn floors of all areas of the hospital […]

Learn More

Construction of a mushroom production plant

Location: Pedino, Kilkis The project includes the construction of two buildings. One building will consist of two volumes, on the south side a canopy will be built to house mechanical equipment and the second building will consist of 2 floors. In addition, two gas tanks will be placed, a weighbridge will be constructed and a […]

Learn More