Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams

Location: Polygyros, Halkidiki

Project budget: 2.000.000,00 €

The project concerns the increase of throughput and the restoration of existing techniques.

Related work

Elementary School Construction Sifnou

Budget: 3.700.400,00 € Basic design of the project is the construction of a new school of elementary school of Sifnos at “Fyrogia” region. It consists of four buildings with a total area of ​​2,370.00 sq.m. and includes 12 classrooms, laboratories, administrative and other offices and shared functions.

Learn More

Retaining Slope Kalntera Thiras -Area Port Athinios (Santorini Island)

Budget : 1.699.400,00 €  The aim of this project is to address rock falls and minimize the risk of accidents in the existing access road to the main port of Santorini island and the total slope of the amphitheater port Athinios. Τhis construction refers to a road that haw a total length of 3.352 m, […]