Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams

Location: Polygyros, Halkidiki

Project budget: 2.000.000,00 €

The project concerns the increase of throughput and the restoration of existing techniques.

Related work

Retaining Slope Kalntera Thiras -Area Port Athinios (Santorini Island)

Budget : 1.699.400,00 €  The aim of this project is to address rock falls and minimize the risk of accidents in the existing access road to the main port of Santorini island and the total slope of the amphitheater port Athinios. Τhis construction refers to a road that haw a total length of 3.352 m, […]

Learn More

Restoration of pedestals of the bridge of the river Nestos on the National Road No.14 Drama Paranesti

Location: Drama Project budget: 1.290.000,00 € The bridge is located on the highway 14 Drama – Xanthi and bridges the river Nestos with a total span of 203. 89 m in the area of Paranesti and was severely damaged.

Learn More