Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors

AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.

Related work

Improvement of the infrastructure of the land area of ​​the port of the fishing refuge of Ν. Kallikrateia Halkidiki

Project budget: 2.362.903,23 €  The project concerns the stabilization of the coastal slope of the settlement of Nea Kallikrateia and the construction of the necessary road works to improve traffic conditions in order to achieve the safe movement of vehicles and pedestrians.

Learn More

Construction of techniques – flood control on the road axis Polygyros – Mount Athos to increase the discharge capacity of streams

Project budget: 2.000.000,00 € The project concerns the increase of throughput and the restoration of existing techniques.

Learn More

Sanitary upgrading of the interiors of the buildings of the General Hospital of Drama

Project budget: 2.000.000,00 € The project will contribute substantially to the sanitary upgrading of the interiors of the buildings of the General Hospital of Drama and consequently to the optimization of the quality and maximization of the quantity of health services. The replacement of the old worn floors of all areas of the hospital with new […]

Learn More