Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors

AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.

Related work

Extension of Primary School in N. Souli

Project budget: 1.403.225,81 € The project concerns the construction of an additional building unit, which will coexist with the existing Primary School on the same plot, in the context of reinforcement the operation of the All-Day Primary School. The building includes a ground floor, basement and first floor, while it has a final height from […]

Learn More

Retaining Slope Kalntera Thiras -Area Port Athinios (Santorini Island)

Budget : 1.699.400,00 €  The aim of this project is to address rock falls and minimize the risk of accidents in the existing access road to the main port of Santorini island and the total slope of the amphitheater port Athinios. Τhis construction refers to a road that haw a total length of 3.352 m, […]

Learn More