Egnatia Odos : Section A/K Efkarpia (K4) – A/K Lagada – Construction and replacement of surface anti-slip layer in both sectors

AS build A.T.E. in a joint venture with the company PSARRAS A.T.E. has undertaken the construction of a 4 cm thick anti-slip asphalt layer, along the entire length and width of the section, as well as in the individual sectors of the Efkarpia, Gerokomeio and Lagada roundabouts.

Related work

Construction of water supply tanks for the settlement of the Municipality of Paggaio

Location: Eleftheroupoli, Kavala Project budget: 1.070.000,00 € The project concerns the construction of three two-chamber tanks, one underground and two above ground. Each tank will have the necessary vestibule (valve station) to protect and control access to the electromechanical equipment, valves and chambers.

Learn More
ergo-thira

Retaining Slope Kalntera Thiras – Old Port Aera Fira -Cable Car(Santorini Island)

Budget : 1.699.400,00 €  The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of […]

Learn More