Extension of Primary School in N. Souli

Project budget: 1.403.225,81 €

The project concerns the construction of an additional building unit, which will coexist with the existing Primary School on the same plot, in the context of reinforcement the operation of the All-Day Primary School. The building includes a ground floor, basement and first floor, while it has a final height from the landscaped ground level 7,05m, without calculating the roof that covers the new faculty without the roof.

Related work

Retaining Slope Kalntera Thiras -Area Port Athinios (Santorini Island)

Budget : 1.699.400,00 €  The aim of this project is to address rock falls and minimize the risk of accidents in the existing access road to the main port of Santorini island and the total slope of the amphitheater port Athinios. Τhis construction refers to a road that haw a total length of 3.352 m, […]