Road Construction in Agricultural Areas

AS Build-Logo

Related work

Retaining Slope Kalntera Thiras -Area Port Athinios (Santorini Island)

Budget : 1.699.400,00 €  The aim of this project is to address rock falls and minimize the risk of accidents in the existing access road to the main port of Santorini island and the total slope of the amphitheater port Athinios. Τhis construction refers to a road that haw a total length of 3.352 m, […]

Learn More

Kaftanzoglio Stadium: Repair and maintenance of facilities

Budget : 917.500,00 € The project was built in 2017 and included the replacement of the synthetic carpet (tartan) of the auxiliary stadium and the natural lawns at both the auxiliary and the main stadium of the stadium, with the replacement of their irrigation systems. The new tartan was manufactured in FPU (full polyurethane) style […]

Learn More
ergo-thira

Retaining Slope Kalntera Thiras – Old Port Aera Fira -Cable Car(Santorini Island)

Budget : 1.699.400,00 €  The aim is to tackle the rocky falls in the old port of Fira in Santorini island, which is located downstream of the homonymous settlement and operated primarily for the convenience of cruise ships calling at bay. In the same area are the lift business, which facilitated the decisive movement of […]

Learn More