Location: Pedino, Kilkis
The project includes the construction of two buildings. One building will consist of two volumes, on the south side a canopy will be built to house mechanical equipment and the second building will consist of 2 floors. In addition, two gas tanks will be placed, a weighbridge will be constructed and a mesh fence will be built at the boundaries of the plot.